41. Management decision-making includes: A. Analysis of alternatives. B. Revisions/replanning. C. Resource allocation. D. Modification or updating of goals and objectives. E. All of the above. ANS: E 42. The basic terminology for .net work

  41. Management decision-making includes:
  A. Analysis of alternatives.
  B. Revisions/replanning.
  C. Resource allocation.
  D. Modification or updating of goals and objectives.
  E. All of the above.
  ANS: E
  
  42. The basic terminology for.networks includes:
  A. Activities, events, manpower, skill levels and slack.
  B. Activities, documentation, events, manpower and skill levels.
  C. Slack, activities, events, and time estimates.
  D. Time estimates, slack, sponsorship involvement, and activities.
  E. Time estimates, slack time, report writing, life cycle phases, and crashing times.
  ANS: C
  
  43. The project manager must receive reports and briefings from engineers, contracting officers, procurement personnel and marketing people.
  The project manager's communication dilemma is one of:
  A. encoding
  B. decoding
  C. choice of a medium
  D. one-way communication
  E. All of the above.
  ANS: E
  
  44. The technique most commonly used to determine the profitability of a project includes _____ methods.
  A. Net present value (NPV).
  B. Return on investment (ROI).
  C. Discounted cash flow (DCF)
  D. Payout time and risk sensitivity analysis.
  E. All of the above.
  ANS: E
  
  45. Which of the following are part of the purchasing cycle:
  A. define need
  B. prepare and issue purchase order
  C. inspect incoming goods
  D. All of the above.
  E. A and B only
  ANS: E
  
  46. Which of the following is closest to Juran's definition of Quality:
  A. conformance to requirements.
  B. fitness for use.
  C. continuous improvement.
  D. customer focus.
  E. All of the above.
  ANS: B
  
  47. A project element which lies between two events is called:
  A. An activity.
  B. A critical path method.
  C. A slack milestone.
  D. A timing slot.
  E. A calendar completion point.
  ANS: A
  
  48. Employee unions would most likely satisfy which level in Maslow's hierarchy of needs?
  A. Belonging
  B. Self-actualization
  C. Esteem
  D. Safety
  E. Empowerment
  ANS: A
  
  49. Management calls a meeting to explain to all employees the new benefits package for the rank and file. This is an example of:
  A. Upward communication
  B. Downward communication
  C. One-way communication
  D. Two-way communication
  E. None of the above.
  ANS: C
  
  50. Project management/project planning is most closely aligned with:
  A. Long range/strategic planning (5 years or more).
  B. Intermediate range planning (1 to 5 years)
  C. Short range/tactical planning (1 year or less).
  D. All of the above.
  E. B and C.
  ANS: E
  
  51. The profitability and technical data studies are provided in report format to owners and funders for aclearcase/" target="_blank" >cceptance. This type of report, used to
  solicit funding, is referred to as a(n) _____.
  A. Project feasibility study.
  B. Economic evaluation analysis.
  C. Risk management manual.
  D. Prospectus.
  E. None of the above
  ANS: D
  
  52. Which of the following constitute Juran's "quality trilogy":
  A. planning, inspection, control.
  B. planning, improvement, control.
  C. planning, organization, control.
  D. product, price, customer.
  E. design, build, deliver.
  ANS: B
  
  53. Which of the following is most closely associated with business risk:
  A. profit and loss
  B. personnel turnover
  C. workmen's compensation
  D. liability insurance
  E. All of the above.
  ANS: A
  
  54. Which of the following types of contracts is equivalent to a cost plus contract:
  A. Fixed firm price
  B. Cost reimbursable
  C. Fixed price plus incentive fee
  D. progress payments
  E. All of the above.
  ANS: B
  
  55. A project manager recently rewarded an individual with a promotion that carried with it a very small salary increase but substantially more
  responsibility. The project manager appears to be appealing to the employee's _____ need.
  A. Monetary
  B. Physiological
  C. Esteem
  D. Self-actualization
  E. Team-building
  ANS: C
  
  56. Most project (and non-project) managers prefer _____ communications.
  A. Oral
  B. Written
  C. Upward
  D. Downward
  E. Lateral
  ANS: A
  
  57. On a precedence diagram, the arrow between two boxes is called:
  A. An activity.
  B. A constraint.
  C. An event.
  D. The critical path.
  E. None of above.
  ANS: B
  
  58. Quality control charts show a characteristic of the product or service against:
  A. the specification limits.
  B. customer requirements.
  C. control limits based on three standard deviations in each direction.
  D. control limits based on six standard deviations in each direction.
  E. A and D only
  ANS: C
  
  59. The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are
  indentified in the _____ phase of the project but first documented in the project _____.
  A. Conceptual, charter/baseline.
  B. Conceptual, master schedule.
  C. Development, charter/baseline.
  D. Development, master schedule.
  E. Development, masterplan.
  ANS: A
  
  60. The work breakdown structure, the work packages, and the company's accounting system are tied together through the:
  A. Code of accounts.
  B. Overhead rates.
  C. Budgeting system.
  D. Capital budgeting process.
  E. All of the above.
  ANS: A
  