Job Scheduling Console Main View
发表于:2007-05-26来源:作者:点击数:
标签:
Detaching a List Display Detaching a list frees the right-pane of the Job Scheduling Console main view to display other objects. You can detach multiple lists to view several objects simultaneously. To detach a list display: 1. Open a list
Detaching a List Display
Detaching a list frees the right-pane of the Job Scheduling Console main view to
display other objects. You can detach multiple lists to view several objects
simultaneously.
To detach a list display:
1. Open a list and wait for the results to be displayed.
2. Click on the Detach Task button in the upper right corner of the right pane.
The list is displayed in a detached window.
3. To place the list back in the right-hand pane, click the Attach Task button in
the upper right corner of the detached list.
Notes:
1. The right-hand pane of the console is not disabled. This is so that you can run
other lists or perform other tasks.
2. To prevent your system from overloading, do not have frequent refreshes of
many detached views open at the same time.
Detaching a List Display
Detaching a list frees the right-pane of the Job Scheduling Console main view to
display other objects. You can detach multiple lists to view several objects
simultaneously.
To detach a list display:
1. Open a list and wait for the results to be displayed.
2. Click on the Detach Task button in the upper right corner of the right pane.
The list is displayed in a detached window.
3. To place the list back in the right-hand pane, click the Attach Task button in
the upper right corner of the detached list.
Notes:
1. The right-hand pane of the console is not disabled. This is so that you can run
other lists or perform other tasks.
2. To prevent your system from overloading, do not have frequent refreshes of
many detached views open at the same time.
原文转自:http://www.ltesting.net
|