• 软件测试技术
  • 软件测试博客
  • 软件测试视频
  • 开源软件测试技术
  • 软件测试论坛
  • 软件测试沙龙
  • 软件测试资料下载
  • 软件测试杂志
  • 软件测试人才招聘
    暂时没有公告

字号: | 推荐给好友 上一篇 | 下一篇

RFC156 - Status of the Illinois site: Response to RFC116

发布: 2007-6-23 14:09 | 作者:   | 来源:   | 查看: 12次 | 进入软件测试论坛讨论

领测软件测试网

   
  Network Working Group J. Bouknight
Request for Comments: 156 26 April 1971
Category: G.5 Illinois
Obsoletes: None
Updates: None

Status of the Illinois Site (Response to RFC0116)

As of the date of the report, 26 April, the Illinois Site has complete
operational hardware connecting the PDP-11 system with the IMP.

Due to much trouble with the Burroughs B6500 computer, final checkout
of the operating system plus the.network control program for the
PDP-11 has been seriously curtailed. Current expectations are:

--checkout of the NCP by the latter part of May

--installation of the PDP-11 system in Paoli, PA (the operating
link between Illinois and Burroughs in Paoli) so that the system
will be operational during June

[ This RFCwas put into machine readable form for entry ]
[ into the online RFCarchives by Tom McGhan 7/97 ]

文章来源于领测软件测试网 https://www.ltesting.net/


关于领测软件测试网 | 领测软件测试网合作伙伴 | 广告服务 | 投稿指南 | 联系我们 | 网站地图 | 友情链接
版权所有(C) 2003-2010 TestAge(领测软件测试网)|领测国际科技(北京)有限公司|软件测试工程师培训网 All Rights Reserved
北京市海淀区中关村南大街9号北京理工科技大厦1402室 京ICP备10010545号-5
技术支持和业务联系:info@testage.com.cn 电话:010-51297073

软件测试 | 领测国际ISTQBISTQB官网TMMiTMMi认证国际软件测试工程师认证领测软件测试网