PMP认证考试试题精选(57)

发布: 2007-5-26 23:09 | 作者: 佚名 | 来源: 互连网 | 查看: 27次 | 进入软件测试论坛讨论

领测软件测试网
  561. The appointment or selection of a project sponsor is often based upon:
  A. The strategic importance of the project
  B. Who the customer is
  C. Whether the organization is project or non-project-driven
  D. The profitability of the project
  E. All of the above
  ANS: E
  562. The strong matrix versus a weak matrix.
  A. team members are more likely to be assigned to the project office in a strong matrix
  B. strong matrix is more difficult to manage.
  C. the balance of power has shifted away from the PM.
  D. functional managers no longer has control over the technical processes.
  E. All of the above.
  ANS: A
  563. When all members must unanimously agree before a decision is reached
  A. all members become committed
  B. decisions are reached slowly
  C. integrity is developed
  D. future decision making ability is enhanced
  E. All of the above.
  ANS: E
  564. A team may not be fully functional until each member
  A. seeks consensus in decision making
  B. feels personal acceptance
  C. depends on the team leader for direction
  D. A and B.
  E. All of the above.
  ANS: D
  565. Quality management deals with all of the following except:
  A. conformance to requirements/specifications
  B. satisfying the needs of the customer
  C. making products more desirable and luxurious
  D. A and C.
  E. B and C
  ANS: C
  566. The difference between a project and a program is that:
  A. A program is made up of multiple projects
  B. A program requires at least three times longer to plan than a project
  C. A project is a one-shot deal while a program is on-going
  D. A and C
  E. B and C
  ANS: D
  567. The functional organization is effective with a mature product or single product line.
  A. true
  B. false
  C.
  D.
  E.
  ANS: A
  568. The most common non-behavioral reason for projects being completed behind schedule and over budget is:
  A. Selecting the wrong person as the project manager
  B. Selecting the wrong person as the sponsor
  C. Accepting a high-risk project
  D. Ill-defined requirements
  E. All of the above
  ANS: D
  569. You have summarized the project and note that 28,000 hours have been scheduled, 25,000 hours have been earned and 26,000 hours paid.
  The correct conclusion is:
  A. The project is operating at a favorable cost efficiency ratio.
  B. the project is spending more than planned
  C. the project is behind schedule
  D. the project is ahead of schedule
  E. B and C
  ANS: C
  570. Considering alternate suppliers is a form of _____.
  A. Value engineering.
  B. Risk Analysis
  C. Contract Management
  D. Project integration
  E. All of the above.
  ANS: A
  
  

延伸阅读

文章来源于领测软件测试网 https://www.ltesting.net/


关于领测软件测试网 | 领测软件测试网合作伙伴 | 广告服务 | 投稿指南 | 联系我们 | 网站地图 | 友情链接
版权所有(C) 2003-2010 TestAge(领测软件测试网)|领测国际科技(北京)有限公司|软件测试工程师培训网 All Rights Reserved
北京市海淀区中关村南大街9号北京理工科技大厦1402室 京ICP备10010545号-5
技术支持和业务联系:info@testage.com.cn 电话:010-51297073

软件测试 | 领测国际ISTQBISTQB官网TMMiTMMi认证国际软件测试工程师认证领测软件测试网