• 软件测试技术
  • 软件测试博客
  • 软件测试视频
  • 开源软件测试技术
  • 软件测试论坛
  • 软件测试沙龙
  • 软件测试资料下载
  • 软件测试杂志
  • 软件测试人才招聘
    暂时没有公告

字号: | 推荐给好友 上一篇 | 下一篇

RFC406 - Scheduled IMP Software Releases

发布: 2007-6-23 14:09 | 作者:   | 来源:   | 查看: 13次 | 进入软件测试论坛讨论

领测软件测试网

   
  Network Working Group John M. McQuillan
Request for Comments # 406 Bolt Beranek and Newman
NIC # 12111 10 October 1972
Categories B.1
Updates RFC# 381

Scheduled IMP Software Releases
-------------------------------


This note is a reminder that the procedures suggested in
RFC# 381 for scheduling IMP software maintenance have now
been in effect for a period of about two months. Two points
apparently require re-emphasis:

1) We reserve the hour from 7 to 8 a.m. eastern time
every Tuesday as the time when IMPs can be reloaded. We will
probably not use this period every Tuesday, but we do reserve
this period every Tuesday. The software maintenance time period
is in addition to the hardware preventive maintenance scheduled
at each site.

2) We now send an IMP - Going - Down message to all
the Hosts at the site which contains information on the time
that the IMP is going down, the expected duration, and the
reason. We try to send out this message an hour before soft-
ware releases, and five to ten minutes before scheduled pre-
ventive maintenance. Further, we will also notify the Hosts
at a site, whenever possible, when it is necessary to stop the
IMP on an unscheduled basis. Finally, 30 seconds before the

[Page 1]

IMP goes down, a second IMP - Going - Down message will be
sent to the Hosts informing them that the IMP is going down
immediately. The format of the IMP - Going - Down message
is as follows:

bits 1 - 4 - all zero

bits 5 - 8 - 0010

bits 9 - 16 - all zero

bits 17 - 32 - coded as follows:

All bits zero - going down in 30 seconds

Bits 17, 18 = 01 - scheduled hardware PM

Bits 17, 18 = 10 - scheduled software reload

Bits 17, 18 = 11 - emergency reload on restart

Bits 19 - 22 - how soon the IMP is going down,
in 5 minute units.

Bits 23 - 32 - how long the IMP will be down, in
5 minute units.

[ This RFCwas put into machine readable form for entry ]
[ into the online RFCarchives by BBN Corp. under the ]
[ direction of Alex McKenzie. 1/97 ]

延伸阅读

文章来源于领测软件测试网 https://www.ltesting.net/


关于领测软件测试网 | 领测软件测试网合作伙伴 | 广告服务 | 投稿指南 | 联系我们 | 网站地图 | 友情链接
版权所有(C) 2003-2010 TestAge(领测软件测试网)|领测国际科技(北京)有限公司|软件测试工程师培训网 All Rights Reserved
北京市海淀区中关村南大街9号北京理工科技大厦1402室 京ICP备10010545号-5
技术支持和业务联系:info@testage.com.cn 电话:010-51297073

软件测试 | 领测国际ISTQBISTQB官网TMMiTMMi认证国际软件测试工程师认证领测软件测试网