  361. History has shown that project managers can be trained in a combination of ways. Which method is usually preferred by most companies?
  A. Experiential learning, on-the-job
  B. Formal education and special course (degreed programs)
  C. Professional activities, seminars
  D. Individual readings
  E. None of the above
  ANS: A
  
  362. The purpose of configuration management is to:
  A. insure drawings are updated
  B. control change throughout the project
  C. control change during the production only
  D. generate engineering change proposals
  E. inform the project manager of changes
  ANS: B
  
  363. Three types of written media used in organizations are _____, _____, and ______.
  A. manual, letters, guidelines
  B. individually-oriented, legally-oriented, organizationally oriented
  C. guidelines, forms, procedures
  D. letters, guidelines, brochures
  E. letters, contracts, policies.
  ANS: D
  
  364. Which of the following is considered a direct cost for producing a widget?
  A. The cost of the materials used to produce a widget.
  B. The labor costs of the workers who actually produced the widget.
  C. The rent for the building in which the widget was manufactured
  D. The salary of senior management and the project sponsor
  E. A and B only
  ANS: E
  
  365. _____ best describes the goal of a project in its relationship with the customer, from initial contact through delivery.
  A. fitness for use
  B. customer satisfaction
  C. conformance to requirements
  D. fitness for purpose
  E. All of the above.
  ANS: B
  
  366. A communicator can present information using the following media except:
  A. Visual
  B. Audio
  C. Tactile
  D. Performal
  E. Both A and B
  ANS: D
  
  367. Advantages of the functional (hierarchical) form of organization include _____ and creation of technical competence.
  A. Ease of horizontal coordination
  B. Clearly defined authority
  C. High information processing capability
  D. Single voice to customers
  E.
  ANS: B
  
  368. Quality and _____ are directly related.
  A. productivity
  B. cost overruns
  C. scope control
  D. Pareto diagram
  E. None of the above.
  ANS: A
  
  369. Resource leveling will often affect the project by making it:
  A. Shorter.
  B. Longer
  C. More responsive to customer needs.
  D. A and C
  E. B and C.
  ANS: B
  
  370. Selection criteria for project selection include:
  A. cost versus benefit
  B. risk
  C. contribution towards organizational goals
  D. rate of return
  E. All of the above.
  ANS: E
  
  

延伸阅读

文章来源于领测软件测试网 https://www.ltesting.net/


关于领测软件测试网 | 领测软件测试网合作伙伴 | 广告服务 | 投稿指南 | 联系我们 | 网站地图 | 友情链接
版权所有(C) 2003-2010 TestAge(领测软件测试网)|领测国际科技(北京)有限公司|软件测试工程师培训网 All Rights Reserved
北京市海淀区中关村南大街9号北京理工科技大厦1402室 京ICP备10010545号-5
技术支持和业务联系:info@testage.com.cn 电话:010-51297073

软件测试 | 领测国际ISTQBISTQB官网TMMiTMMi认证国际软件测试工程师认证领测软件测试网