Bug

上一篇 / 下一篇  2009-02-26 10:24:30 / 个人分类:测试类

 
MILY: 'Myriad Web'; mso-ascii-font-family: 'Myriad Web'; mso-fareast-font-family: 宋体; mso-hansi-font-family: 'Myriad Web'; mso-fareast-language: ZH-CN">

We are going to introduce following:

§       1. What is a Bug

§       2. The Bug elements

§       3. The life cycle of a Bug

 

 

 What is a bug?

1.  A formatted form. can managed

2. Reflect an existing issue

3. The Carrier of Communication

4. Quality track bases

5. Workload measure

6. Case measure

 

 

Why bug is a formatted form. can managed?

Put all involved people at same page by a specific format:

  • Easy write by QA with same template
  • Easy read by Dev. with same template
  • Easy to classify for time saving
  • Easy to assign resources
  • Easy to track
  • Easy to analysis
  • Easy to communicate

 

 

How bug reflect an existing issue?

Included all required information to it clearly:

  • Number
  • Type
  • Reporter
  • CC List
  • Assigner
  • Product information
  • Status and Resolution
  • Priority and Severity
  • Content
  • Flags
  • Summary
  • Environments
  • Build Version
  • Parameters and Data
  • Pre-configuration
  • Steps
  • Expected result
  • Actual result
  • Workaround
  • Attachment
  • Related bugs
  • Dev. comments
  • QA comments
  • Management comments

 

 

What be carried in communication?

All information that used to fix and track bug:

  • The all required information to reproduce the issue
  • The Dev. fixing information
  • The QA provided additional information
  • The QA verification information
  • The status information
  • The handling information

 

 

When track quality base on bug?

If the bugs affect the original test plan in progress:

  • Bug is missed
  • Bug is a blocker
  • Too many bugs were found in specific functional area
  • Too many reopening happened
  • Resources changed
  • After functional testing and before regression testing
  • After a new version released
  • Before a plan be made(*)

 

Whose workload can measure?

Measuring different roles’ workload before and after milestone:

  • Fixed rate
  • Fixed time
  • Fixed quantity
  • Reported rate
  • Reported quality
  • Reported quantity

 

Where measure the case base on bug?

  • The case quality
  • The case quantity
  • The case deep
  • The case span
  • The case priority
  • The case severity

 

The life cycle of a Bug

 

Phase:

  • Opening ( New, Assigned, Reopened and Resolved)
  • Closed (Verified and Closed)

 

Role:

  • QA – Assigned, Resolved, Verified and Closed
  • Dev. – New, Assigned and Reopened 

 


TAG: bug BUG Bug

 

评分:0

我来说两句

显示全部

:loveliness: :handshake :victory: :funk: :time: :kiss: :call: :hug: :lol :'( :Q :L ;P :$ :P :o :@ :D :( :)

我的栏目

日历

« 2011-05-24  
1234567
891011121314
15161718192021
22232425262728
293031    

我的存档

数据统计

  • 访问量: 2542
  • 日志数: 7
  • 文件数: 1
  • 建立时间: 2009-02-26
  • 更新时间: 2009-02-26

RSS订阅

Open Toolbar