• 软件测试技术
  • 软件测试博客
  • 软件测试视频
  • 开源软件测试技术
  • 软件测试论坛
  • 软件测试沙龙
  • 软件测试资料下载
  • 软件测试杂志
  • 软件测试人才招聘
    暂时没有公告

字号: | 推荐给好友 上一篇 | 下一篇

RFC301 - BBN IMP (#5) and NCC Schedule March 4, 1971

发布: 2007-6-23 14:09 | 作者:   | 来源:   | 查看: 17次 | 进入软件测试论坛讨论

领测软件测试网

   
  Network Working Group R. Alter
Request for Comments #301 BBN
NIC #9073 11 February 1972
References: None
Updates: None
Obsoletes: None

BBN IMP (#5) AND NCC SCHEDULE MARCH 4, 1971

On Saturday morning, March 4, 1972, at 0800 EST the BBN IMP (#5)
will go off the air to allow for a move of the equipment to a
new location in BBN's facilities. The NCC telephone and operators
will be available as usual during this period. We hope to have
the IMP back on the Network by early Saturday afternoon; the
choice of Saturday morning was made intentionally so that if by
some stroke of fate all our wideband lines stay down longer than
anticipated, the impact on others in the.network will be minimized.
We anticipate that all other sites will operate normally through
this period.

Shortly subsequent to this move, a new Host will be connected to
the net. This is a PDP-1D at BBN which will be used for certain
additional NCC functions. It will not be a Server site. We
prefer the Host name "BBN-1D"; its network address will be 197.

RA/jm

[ This RFCwas put into machine readable form for entry ]
[ into the online RFCarchives by BBN Corp. under the ]
[ direction of Alex McKenzie. 12/96 ]

文章来源于领测软件测试网 https://www.ltesting.net/


关于领测软件测试网 | 领测软件测试网合作伙伴 | 广告服务 | 投稿指南 | 联系我们 | 网站地图 | 友情链接
版权所有(C) 2003-2010 TestAge(领测软件测试网)|领测国际科技(北京)有限公司|软件测试工程师培训网 All Rights Reserved
北京市海淀区中关村南大街9号北京理工科技大厦1402室 京ICP备10010545号-5
技术支持和业务联系:info@testage.com.cn 电话:010-51297073

软件测试 | 领测国际ISTQBISTQB官网TMMiTMMi认证国际软件测试工程师认证领测软件测试网