4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect the current state of the product.
6. Curriculum has done a content review of the lessons.
Exit Criteria for Integration phase are:
1. The Integration engineer has tested for install ability.
2. All priority a bug have been fixed and closed.
3. Internal documentation has been updated to reflect the current state of the product.
4. The Technical Lead has submitted all files for integration accompanied by Release Notes.
Entry Criteria for System testing phase are:
1. QA has spot tested content, features, and functionality of the product and verified that it is feature-complete.
2. The user interface and the feature set are frozen.
3. The final CD-ROM layout has been determined.
4. The Technical Lead has submitted all files for integration accompanied by Release Notes.
5. The Integration engineer has tested for install ability.
6. All priority a bug have been fixed and closed.
7. Internal documentation has been updated to reflect the current state of the product. Exit Criteria for System testing
The Exit Criteria for the System testing phase are:
1. Final Publications Draft of product publications, including the Quick Start Guide, has been reviewed, tested in QA, and approved by the Core Team.
2. All priority a bug have been fixed and closed.
3. The software runs on all the product’s supported hardware and software configurations.
4. The product is compatible with third-party products as specified in the Functional Spec. Final Entry Criteria
The Entry Criteria for the Final phase are
1. Quality Assurance Plan approved.
2. The work has been approved and signed off by Product Marketing
3. Final Publications Draft of product publications, including the Quick Start Guide, has been reviewed, tested in QA, and approved by the Core Team.
4. All priority a bug have been fixed and closed.
5. The software runs on all the product’s supported hardware and software configurations.
6. The product is compatible with third-party products as specified in the Functional Spec.
文章来源于领测软件测试网 https://www.ltesting.net/